|
| | | | | In 1984-1999 modernization of PRP was carried out (articles "779", "503", "508", "509").In 1992 the plant began manufacturing tracked railroad repair vehicles (GPL-520). In 1993 the plant started quantity production of BRM-3K vehicles, and since 1995 - RMG (tracked repair vehicle). Basing on units of BMP-1 (AIFV), a number oftraked vehicles for national economy was designed and put to quantity production.
| Since 1993 quantity production of the following articles began:
| | |
|